{"id":1521,"date":"2012-08-13T09:51:48","date_gmt":"2012-08-13T16:51:48","guid":{"rendered":"http:\/\/beltegrity.com\/?page_id=1521"},"modified":"2012-08-24T13:49:10","modified_gmt":"2012-08-24T20:49:10","slug":"abstract-diaz-sewage-lift-station-replacement-facilities","status":"publish","type":"page","link":"https:\/\/kriegerandstewart.com\/?page_id=1521","title":{"rendered":"Abstract &#8211; Diaz Sewage Lift Station Replacement Facilities"},"content":{"rendered":"<h2>Diaz Sewage Lift Station Replacement Facilities<\/h2>\n<p><strong>Client:<\/strong> Eastern Municipal Water District<br \/>\n<strong>Location:<\/strong> Temecula, California<br \/>\n<strong>Construction Cost:<\/strong> $8M<br \/>\n<strong>Flow:<\/strong> 12 MGD<\/p>\n\r\n<div class=\"column grid_4\">\r\n\r\n&nbsp;\r\n<h3><span style=\"color: #0033cc;\">Project Features:<strong>\r\n<\/strong><\/span><\/h3>\r\n<ul>\r\n\t<li><span style=\"color: #0033cc;\">Submersible Lift Station with Standby Generator and ATS<\/span><\/li>\r\n\t<li><span style=\"color: #0033cc;\">Biofilter Odor Control System<\/span><\/li>\r\n\t<li><span style=\"color: #0033cc;\">Connections to Existing Gravity Sewer and Force Mains<\/span><\/li>\r\n\t<li><span style=\"color: #0033cc;\">Bypass Pumping Required for Construction<\/span><\/li>\r\n\t<li><span style=\"color: #0033cc;\">Removal and Demolition of Existing Lift Station Facilities<\/span><\/li>\r\n<\/ul>\r\n<\/div><!-- .column (end) -->\r\n<p style=\"text-align: center;\"><div class=\"column grid_8 last\"><\/p>\r\n<p style=\"text-align: center;\"><img loading=\"lazy\" decoding=\"async\" class=\"aligncenter size-full wp-image-1669\" title=\"Diaz Sewage Lift Station Replacement Facilities\" src=\"https:\/\/kriegerandstewart.com\/wp-content\/uploads\/2012\/08\/Diaz_Sewage_LS.jpg\" alt=\"Diaz Sewage Lift Station Replacement Facilities\" width=\"501\" height=\"345\" srcset=\"https:\/\/kriegerandstewart.com\/wp-content\/uploads\/2012\/08\/Diaz_Sewage_LS.jpg 501w, https:\/\/kriegerandstewart.com\/wp-content\/uploads\/2012\/08\/Diaz_Sewage_LS-300x206.jpg 300w, https:\/\/kriegerandstewart.com\/wp-content\/uploads\/2012\/08\/Diaz_Sewage_LS-195x134.jpg 195w\" sizes=\"auto, (max-width: 501px) 100vw, 501px\" \/><\/p>\r\n<p style=\"text-align: center;\"><\/div><!-- .column (end) -->\r\n<div class=\"clear\"><\/div>\r\n<\/p>\n<h3>Description:<\/h3>\n<p>The work consisted of preparation of Contract Documents for construction of a submersible lift station with four submersible pumping units and scum removal system; construction of masonry control building housing electrical, switchgear, and generator; installation of biofilter odor control system; construction of 10&#8243; and 33&#8243; gravity sewers (including connections to proposed wet well and existing manholes); construction of landscaping; construction of new force main; connections to existing gravity sewers and force mains; and demolition and abandonment of the existing Diaz Sewage Lift Station.<\/p>\n<h3>Services Provided:<\/h3>\n<p>Krieger &amp; Stewart provided design engineering services which consisted of preliminary design, preparation of legal descriptions and plats for right-of-way acquisition, geotechnical investigation, utility verification, permit acquisition, preparation of Contract Documents, preparation of sequence of work including bypass requirements, and preparation of detailed construction cost estimates.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Diaz Sewage Lift Station Replacement Facilities Client: Eastern Municipal Water District Location: Temecula, California Construction Cost: $8M Flow: 12 MGD Description: The work consisted of preparation of Contract Documents for construction of a submersible lift station with four submersible pumping units and scum removal system; construction of masonry control building housing electrical, switchgear, and generator; [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"parent":0,"menu_order":0,"comment_status":"open","ping_status":"open","template":"","meta":{"footnotes":""},"class_list":["post-1521","page","type-page","status-publish","hentry"],"_links":{"self":[{"href":"https:\/\/kriegerandstewart.com\/index.php?rest_route=\/wp\/v2\/pages\/1521","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/kriegerandstewart.com\/index.php?rest_route=\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/kriegerandstewart.com\/index.php?rest_route=\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/kriegerandstewart.com\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/kriegerandstewart.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=1521"}],"version-history":[{"count":3,"href":"https:\/\/kriegerandstewart.com\/index.php?rest_route=\/wp\/v2\/pages\/1521\/revisions"}],"predecessor-version":[{"id":1926,"href":"https:\/\/kriegerandstewart.com\/index.php?rest_route=\/wp\/v2\/pages\/1521\/revisions\/1926"}],"wp:attachment":[{"href":"https:\/\/kriegerandstewart.com\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=1521"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}