{"id":1537,"date":"2012-08-13T13:47:48","date_gmt":"2012-08-13T20:47:48","guid":{"rendered":"http:\/\/beltegrity.com\/?page_id=1537"},"modified":"2012-11-07T16:23:37","modified_gmt":"2012-11-08T00:23:37","slug":"abstract-thermal-water-and-sewer-improments","status":"publish","type":"page","link":"https:\/\/kriegerandstewart.com\/?page_id=1537","title":{"rendered":"Abstract &#8211; Thermal Water and Sewer Improvements"},"content":{"rendered":"<h2>Thermal Water and Sewer Improvements<\/h2>\n<p><strong>Client:<\/strong> Riverside County Economic Development Agency<br \/>\n(formerly Redevelopment Agency for the County of Riverside)<br \/>\n<strong>Location:<\/strong> Thermal, California<br \/>\n<strong>Construction Cost:<\/strong> $13M<br \/>\n<div class=\"column grid_4\"><\/p>\n<h3><span style=\"color: #0033cc;\">Project Features:<strong><br \/>\n<\/strong><\/span><\/h3>\n<ul>\n<li><span style=\"color: #0033cc;\">Approx. 18,300 L.F. of 12&#8243;-27&#8243; Sewer Pipe<\/span><\/li>\n<li><span style=\"color: #0033cc;\">Approx. 36,000 L.F. of 18&#8243;-24&#8243; Water Pipe<\/span><\/li>\n<li><span style=\"color: #0033cc;\">Pressure Reducing Station<\/span><\/li>\n<li><span style=\"color: #0033cc;\">Open Trench Construction<\/span><\/li>\n<\/ul>\n<p><\/div><!-- .column (end) --><\/p>\n<p style=\"text-align: center;\"><div class=\"column grid_8 last\"><\/p>\n<p style=\"text-align: center;\"><img loading=\"lazy\" decoding=\"async\" class=\"aligncenter size-full wp-image-1694\" title=\"Thermal Water and Sewer Improvements\" src=\"https:\/\/kriegerandstewart.com\/wp-content\/uploads\/2012\/08\/Thermal_Water_and_Sewer.jpg\" alt=\"Thermal Water and Sewer Improvements\" width=\"449\" height=\"345\" srcset=\"https:\/\/kriegerandstewart.com\/wp-content\/uploads\/2012\/08\/Thermal_Water_and_Sewer.jpg 449w, https:\/\/kriegerandstewart.com\/wp-content\/uploads\/2012\/08\/Thermal_Water_and_Sewer-300x230.jpg 300w, https:\/\/kriegerandstewart.com\/wp-content\/uploads\/2012\/08\/Thermal_Water_and_Sewer-195x149.jpg 195w\" sizes=\"auto, (max-width: 449px) 100vw, 449px\" \/><\/p>\n<p style=\"text-align: center;\"><\/div><!-- .column (end) --><\/p>\n<h3>Description:<\/h3>\n<p>The sewer portion of Thermal Water and Sewer Project consisted of the construction of approximately 18,300 LF of 27&#8243; VCP, 24&#8243; VCP, 21&#8243; VCP, 18&#8243; VCP, and 12&#8243; VCP gravity sewer installed at a depth between 16 feet and 21 feet, boring and jacking approximately 280 LF of steel casing ranging in size from 48&#8243; to 24&#8243; and placing VCP in casing. The water portion of Thermal Water Improvement Project consisted of the construction of approximately <strong>36,000 LF of 24&#8243; and 18&#8243; DIP<\/strong>, boring and jacking approximately 200 LF of 42&#8243; steel casing, as well as approximately 100 LF of 42&#8243; steel casing installed by open cut method, and placing 24&#8243; DIP in casing. Additionally, the project included a pressure reducing station.<\/p>\n<h3>Services Provided:<\/h3>\n<p>Krieger &amp; Stewart provided design engineering services which consisted of preparation of CEQA documents, preparation of legal descriptions, and plats for right-of-way acquisition, geotechnical investigation, utility verification, acquisition of permits, preparation of Contract Documents, and preparation of construction cost estimates. Krieger &amp; Stewart also provided <strong>construction engineering services which consisted of construction management, contract administration, construction inspection, and construction staking.<\/strong><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Thermal Water and Sewer Improvements Client: Riverside County Economic Development Agency (formerly Redevelopment Agency for the County of Riverside) Location: Thermal, California Construction Cost: $13M Description: The sewer portion of Thermal Water and Sewer Project consisted of the construction of approximately 18,300 LF of 27&#8243; VCP, 24&#8243; VCP, 21&#8243; VCP, 18&#8243; VCP, and 12&#8243; VCP [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"parent":0,"menu_order":0,"comment_status":"open","ping_status":"open","template":"","meta":{"footnotes":""},"class_list":["post-1537","page","type-page","status-publish","hentry"],"_links":{"self":[{"href":"https:\/\/kriegerandstewart.com\/index.php?rest_route=\/wp\/v2\/pages\/1537","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/kriegerandstewart.com\/index.php?rest_route=\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/kriegerandstewart.com\/index.php?rest_route=\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/kriegerandstewart.com\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/kriegerandstewart.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=1537"}],"version-history":[{"count":14,"href":"https:\/\/kriegerandstewart.com\/index.php?rest_route=\/wp\/v2\/pages\/1537\/revisions"}],"predecessor-version":[{"id":2006,"href":"https:\/\/kriegerandstewart.com\/index.php?rest_route=\/wp\/v2\/pages\/1537\/revisions\/2006"}],"wp:attachment":[{"href":"https:\/\/kriegerandstewart.com\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=1537"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}