{"id":575,"date":"2012-05-09T14:32:37","date_gmt":"2012-05-09T21:32:37","guid":{"rendered":"http:\/\/beltegrity.com\/?page_id=575"},"modified":"2012-08-20T11:52:43","modified_gmt":"2012-08-20T18:52:43","slug":"western-wrf","status":"publish","type":"page","link":"https:\/\/kriegerandstewart.com\/?page_id=575","title":{"rendered":"Abstract &#8211; Western WRF"},"content":{"rendered":"<h2>Western Water Recycling Facility Phase 2 Expansion<\/h2>\n<p><strong>Client:<\/strong> Western Municipal Water District<br \/>\n<strong>Location:<\/strong> \u00a0Riverside, California<br \/>\n<strong>Construction Cost:<\/strong>\u00a0 $50M<\/p>\n<div class=\"column grid_4\"><\/p>\n<h3><span style=\"color: #0033cc;\">Project Features:<\/span><\/h3>\n<ul>\n<li><span style=\"color: #0033cc;\">Recycled Water Pump Station with Four 200\u00a0hp Vertical Turbine Pumping Units with VFDs<\/span><\/li>\n<li><span style=\"color: #0033cc;\">Chemical Feed and Storage Systems<strong><\/strong><\/span><\/li>\n<li><span style=\"color: #0033cc;\">Surge Arrestor<strong><\/strong><\/span><\/li>\n<li><span style=\"color: #0033cc;\">Several Masonry Block Buildings<strong><\/strong><\/span><\/li>\n<li><span style=\"color: #0033cc;\">Emergency Standby Generator<strong><\/strong><\/span><\/li>\n<li><span style=\"color: #0033cc;\">SCE Utility Service Coordination Required<strong><\/strong><\/span><\/li>\n<li><span style=\"color: #0033cc;\">Involved Subconsultant for Landsape Architecture<\/span><\/li>\n<li><span style=\"color: #0033cc;\">SCADA System<\/span><\/li>\n<\/ul>\n<p style=\"text-align: left;\"><\/div><!-- .column (end) -->\n<p style=\"text-align: center;\"><div class=\"column grid_8 last\"><\/p>\n<p style=\"text-align: center;\"><img loading=\"lazy\" decoding=\"async\" class=\"aligncenter size-full wp-image-1662\" title=\"Western Water Recycling Facility Phase 2 Expansion\" src=\"https:\/\/kriegerandstewart.com\/wp-content\/uploads\/2012\/08\/Western-WRF.jpg\" alt=\"Western Water Recycling Facility Phase 2 Expansion\" width=\"448\" height=\"344\" srcset=\"https:\/\/kriegerandstewart.com\/wp-content\/uploads\/2012\/08\/Western-WRF.jpg 448w, https:\/\/kriegerandstewart.com\/wp-content\/uploads\/2012\/08\/Western-WRF-300x230.jpg 300w, https:\/\/kriegerandstewart.com\/wp-content\/uploads\/2012\/08\/Western-WRF-195x149.jpg 195w\" sizes=\"auto, (max-width: 448px) 100vw, 448px\" \/><\/p>\n<p style=\"text-align: center;\"><\/div><!-- .column (end) --><br \/>\n<div class=\"clear\"><\/div><\/p>\n<h3>Description:<\/h3>\n<p>The Western Water Recycling Facility Phase 2 Expansion consisted of expansion of the existing facility to 3.0\u00a0MGD capacity secondary and tertiary treatment facilities.\u00a0 The project facilities included: headworks with two mechanical bar screens, two vortex-type grit removal chambers, monitoring, and metering; sewage lift station; three primary sedimentation tanks; three oxidation ditch-type aeration basins with two 75\u00a0hp slow speed surface aerators and control system for simultaneous nitrification and denitrification; four circular secondary clarifiers; two secondary effluent balancing ponds; tertiary influent pump station; three cloth media\u2011type filter units; four chlorine contact chambers; tertiary storage pond; two anaerobic digesters; and recycled water booster station with four 200\u00a0hp pumping units and algae removal screens.<\/p>\n<p>The\u00a0project also included a recycled water pump station with four 200\u00a0hp vertical turbine pumping units, each with variable frequency drives and three automatically cleaning algae filters\/strainers, and modification of a recycled storage pond to add two concrete lined, 1.2 MG balancing ponds.\u00a0 <strong>The expansion was sequenced to enable continuous operation of the existing plant; no unplanned treatment process interruptions were experienced.\u00a0 The project involved working closely with and as an extension to Western&#8217;s staff.\u00a0 Constructability and sequencing considerations were an integral portion of both the design and construction engineering services.<\/strong><\/p>\n<h3>Services Provided:<\/h3>\n<p>Krieger &amp; Stewart provided planning, environmental, preliminary design, final design, bidding, construction engineering, construction management, construction inspection, construction staking, and startup services.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Western Water Recycling Facility Phase 2 Expansion Client: Western Municipal Water District Location: \u00a0Riverside, California Construction Cost:\u00a0 $50M Description: The Western Water Recycling Facility Phase 2 Expansion consisted of expansion of the existing facility to 3.0\u00a0MGD capacity secondary and tertiary treatment facilities.\u00a0 The project facilities included: headworks with two mechanical bar screens, two vortex-type grit [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"parent":0,"menu_order":0,"comment_status":"open","ping_status":"open","template":"","meta":{"footnotes":""},"class_list":["post-575","page","type-page","status-publish","hentry"],"_links":{"self":[{"href":"https:\/\/kriegerandstewart.com\/index.php?rest_route=\/wp\/v2\/pages\/575","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/kriegerandstewart.com\/index.php?rest_route=\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/kriegerandstewart.com\/index.php?rest_route=\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/kriegerandstewart.com\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/kriegerandstewart.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=575"}],"version-history":[{"count":3,"href":"https:\/\/kriegerandstewart.com\/index.php?rest_route=\/wp\/v2\/pages\/575\/revisions"}],"predecessor-version":[{"id":1817,"href":"https:\/\/kriegerandstewart.com\/index.php?rest_route=\/wp\/v2\/pages\/575\/revisions\/1817"}],"wp:attachment":[{"href":"https:\/\/kriegerandstewart.com\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=575"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}