{"id":842,"date":"2012-05-16T11:47:00","date_gmt":"2012-05-16T18:47:00","guid":{"rendered":"http:\/\/beltegrity.com\/?page_id=842"},"modified":"2012-08-20T13:36:53","modified_gmt":"2012-08-20T20:36:53","slug":"abstract-hemetsan-jacinto-integrated-recharge","status":"publish","type":"page","link":"https:\/\/kriegerandstewart.com\/?page_id=842","title":{"rendered":"Abstract &#8211; Hemet\/San Jacinto Integrated Recharge"},"content":{"rendered":"<h2>Hemet\/San Jacinto Integrated Recharge and Recovery Program Phase 1 Well Pumping Facilities<\/h2>\n<p><strong>Client:<\/strong>\u00a0 Eastern Municipal Water District<br \/>\n<strong>Location:<\/strong>\u00a0 San Jacinto, California<br \/>\n<strong>Construction Cost:<\/strong>\u00a0 $15M<\/p>\n<div class=\"column grid_4\"><\/p>\n<h3><span style=\"color: #0033cc;\">Project Features:<\/span><\/h3>\n<ul>\n<li><span style=\"color: #0033cc;\">Three Separate Well Sites (each with one 450 hp vertical turbine pumping unit with VFD)<\/span><\/li>\n<li><span style=\"color: #0033cc;\">Masonry Block Building<strong><\/strong><\/span><\/li>\n<li><span style=\"color: #0033cc;\">Designed to Match Surrounding Residential Neighborhood<strong><\/strong><\/span><\/li>\n<li><span style=\"color: #0033cc;\">Chemical Generation (sodium hypochlorite), Storage, and Feed Facilities (sodium hypochlorite and fluoride)<strong><\/strong><\/span><\/li>\n<li><span style=\"color: #0033cc;\">SCADA System<\/span><\/li>\n<\/ul>\n<p style=\"text-align: left;\"><\/div><!-- .column (end) -->\n<p style=\"text-align: center;\"><div class=\"column grid_8 last\"><\/p>\n<p style=\"text-align: center;\"><img loading=\"lazy\" decoding=\"async\" class=\"aligncenter size-full wp-image-1676\" title=\"Hemet\/San Jacinto Integrated Recharge and Recovery Program Phase 1 Well Pumping Facilities\" src=\"https:\/\/kriegerandstewart.com\/wp-content\/uploads\/2012\/08\/Hemet-San_Jacinto.jpg\" alt=\"Hemet\/San Jacinto Integrated Recharge and Recovery Program Phase 1 Well Pumping Facilities\" width=\"448\" height=\"345\" srcset=\"https:\/\/kriegerandstewart.com\/wp-content\/uploads\/2012\/08\/Hemet-San_Jacinto.jpg 448w, https:\/\/kriegerandstewart.com\/wp-content\/uploads\/2012\/08\/Hemet-San_Jacinto-300x231.jpg 300w, https:\/\/kriegerandstewart.com\/wp-content\/uploads\/2012\/08\/Hemet-San_Jacinto-195x150.jpg 195w\" sizes=\"auto, (max-width: 448px) 100vw, 448px\" \/><\/p>\n<p style=\"text-align: center;\"><\/div><!-- .column (end) --><br \/>\n<div class=\"clear\"><\/div><\/p>\n<h3>Description:<\/h3>\n<p>The Hemet\/San Jacinto Integrated Recharge and Recovery Program Phase I Well Pumping Facilities consisted of design and construction of three deep well vertical turbine pumping facilities for Wells 90, 91, and 92 with production ranges from 1,500 gpm to 2,000 gpm.\u00a0 Design included provisions to add future replacement well, lateral recharge pipelines (Wells 91 and 92), and future monitoring well (Well\u00a091) on listed well sites.\u00a0 The project facilities for each site included electrical equipment building, deep well vertical turbine well pump, electrical automatic valves, flow and conductivity metering, 75\u00a0pound per day chlorine generation and dosing facilities (ClorTec), fluorosilicic acid (fluoride) storage and dosing facilities, HVAC equipment and well level and discharge pressure monitoring, site grading and fencing, associated well discharge and blowoff pipelines, and all associated electrical and control facilities.\u00a0 <strong>The project involved working closely with and as an extension to District staff.<\/strong><\/p>\n<h3>Services Provided:<\/h3>\n<p>Krieger &amp; Stewart provided planning, environmental, preliminary design, final design, bidding, and construction engineering services (including equipment and electrical inspection and startup services).\u00a0 Krieger &amp; Stewart provided all of the civil, structural, mechanical, architectural, electrical, and instrumentation design.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Hemet\/San Jacinto Integrated Recharge and Recovery Program Phase 1 Well Pumping Facilities Client:\u00a0 Eastern Municipal Water District Location:\u00a0 San Jacinto, California Construction Cost:\u00a0 $15M Description: The Hemet\/San Jacinto Integrated Recharge and Recovery Program Phase I Well Pumping Facilities consisted of design and construction of three deep well vertical turbine pumping facilities for Wells 90, 91, [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"parent":0,"menu_order":0,"comment_status":"open","ping_status":"open","template":"","meta":{"footnotes":""},"class_list":["post-842","page","type-page","status-publish","hentry"],"_links":{"self":[{"href":"https:\/\/kriegerandstewart.com\/index.php?rest_route=\/wp\/v2\/pages\/842","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/kriegerandstewart.com\/index.php?rest_route=\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/kriegerandstewart.com\/index.php?rest_route=\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/kriegerandstewart.com\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/kriegerandstewart.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=842"}],"version-history":[{"count":1,"href":"https:\/\/kriegerandstewart.com\/index.php?rest_route=\/wp\/v2\/pages\/842\/revisions"}],"predecessor-version":[{"id":1834,"href":"https:\/\/kriegerandstewart.com\/index.php?rest_route=\/wp\/v2\/pages\/842\/revisions\/1834"}],"wp:attachment":[{"href":"https:\/\/kriegerandstewart.com\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=842"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}