{"id":846,"date":"2012-05-16T11:49:18","date_gmt":"2012-05-16T18:49:18","guid":{"rendered":"http:\/\/beltegrity.com\/?page_id=846"},"modified":"2012-08-24T13:38:18","modified_gmt":"2012-08-24T20:38:18","slug":"abstract-snow-creek-diversion","status":"publish","type":"page","link":"https:\/\/kriegerandstewart.com\/?page_id=846","title":{"rendered":"Abstract &#8211; Snow Creek Diversion"},"content":{"rendered":"<h2>Snow Creek Diversion, Headworks, and Power Generation Project<\/h2>\n<p><strong>Client:<\/strong>\u00a0 Desert Water Agency<br \/>\n<strong>Location:<\/strong>\u00a0 Palm Springs, California<br \/>\n<strong>Construction Cost:<\/strong>\u00a0 $6.1M<\/p>\n<div class=\"column grid_4\"><\/p>\n<h3><span style=\"color: #0033cc;\">Project Features:<br \/>\n<\/span><\/h3>\n<ul>\n<li><span style=\"color: #0033cc;\">Concrete Surface Water Diversion Facilities<\/span><\/li>\n<li><span style=\"color: #0033cc;\">Moving Intake Screen<\/span><\/li>\n<li><span style=\"color: #0033cc;\">Water Treatment and Disinfection Facilities<\/span><\/li>\n<li><span style=\"color: #0033cc;\">1.0 MG Water Storage Retention<\/span><\/li>\n<li><span style=\"color: #0033cc;\">11,000 L.F. of 20&#8243; Penstock<\/span><\/li>\n<li><span style=\"color: #0033cc;\">350 kW Hydroelectric Generating Station<\/span><\/li>\n<li><span style=\"color: #0033cc;\">38,600 L.F. of 24&#8243; Water Transmission Pipeline<\/span><\/li>\n<\/ul>\n<p><\/div><!-- .column (end) -->\n<p style=\"text-align: center;\"><div class=\"column grid_8 last\"><\/p>\n<p style=\"text-align: center;\"><img loading=\"lazy\" decoding=\"async\" class=\"aligncenter size-full wp-image-1691\" title=\"Snow Creek Diversion, Headworks, and Power Generation Project\" src=\"https:\/\/kriegerandstewart.com\/wp-content\/uploads\/2012\/08\/Snow_Creek_Diversion.jpg\" alt=\"Snow Creek Diversion, Headworks, and Power Generation Project\" width=\"337\" height=\"448\" srcset=\"https:\/\/kriegerandstewart.com\/wp-content\/uploads\/2012\/08\/Snow_Creek_Diversion.jpg 337w, https:\/\/kriegerandstewart.com\/wp-content\/uploads\/2012\/08\/Snow_Creek_Diversion-225x300.jpg 225w, https:\/\/kriegerandstewart.com\/wp-content\/uploads\/2012\/08\/Snow_Creek_Diversion-146x195.jpg 146w\" sizes=\"auto, (max-width: 337px) 100vw, 337px\" \/><\/p>\n<p style=\"text-align: center;\"><\/div><!-- .column (end) --><br \/>\n<div class=\"clear\"><\/div><\/p>\n<h3>Description:<\/h3>\n<p>The project consisted of the construction or reconstruction of numerous facilities related to the diversion of water from the Agency&#8217;s Snow Creek surface water source.\u00a0 Facilities constructed included a replacement reinforced concrete surface water diversion, new headworks (including intake screen, water treatment, and disinfection facilities), a 1.0 MG welded steel water storage reservoir, 11,000\u00b1 L.F. of 20&#8243; diameter aboveground and belowground penstock running from the storage reservoir to a 350 kW hydroelectric generating station, the hydroelectric generating station, and 38,600\u00b1 L.F. of 24&#8243; transmission pipeline running from the generating station to the Agency&#8217;s service area in the City of Palm Springs.<\/p>\n<h3>Services Provided:<\/h3>\n<p>Services provided by Krieger &amp; Stewart included preparation of numerous environmental documents, Caltrans longitudinal encroachment permit acquisition, surveying, site and alignment selection, utility excavation and verification, preliminary design, design engineering (including structural, electrical, and mechanical engineering), equipment selection, contract document preparation, assistance with the bidding and award process for each phase\/component of the project, and construction engineering (contract administration, submittals review, and construction observation, and field testing of all project facilities).<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Snow Creek Diversion, Headworks, and Power Generation Project Client:\u00a0 Desert Water Agency Location:\u00a0 Palm Springs, California Construction Cost:\u00a0 $6.1M Description: The project consisted of the construction or reconstruction of numerous facilities related to the diversion of water from the Agency&#8217;s Snow Creek surface water source.\u00a0 Facilities constructed included a replacement reinforced concrete surface water diversion, [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"parent":0,"menu_order":0,"comment_status":"open","ping_status":"open","template":"","meta":{"footnotes":""},"class_list":["post-846","page","type-page","status-publish","hentry"],"_links":{"self":[{"href":"https:\/\/kriegerandstewart.com\/index.php?rest_route=\/wp\/v2\/pages\/846","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/kriegerandstewart.com\/index.php?rest_route=\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/kriegerandstewart.com\/index.php?rest_route=\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/kriegerandstewart.com\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/kriegerandstewart.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=846"}],"version-history":[{"count":6,"href":"https:\/\/kriegerandstewart.com\/index.php?rest_route=\/wp\/v2\/pages\/846\/revisions"}],"predecessor-version":[{"id":1919,"href":"https:\/\/kriegerandstewart.com\/index.php?rest_route=\/wp\/v2\/pages\/846\/revisions\/1919"}],"wp:attachment":[{"href":"https:\/\/kriegerandstewart.com\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=846"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}