{"id":857,"date":"2012-05-16T11:53:49","date_gmt":"2012-05-16T18:53:49","guid":{"rendered":"http:\/\/beltegrity.com\/?page_id=857"},"modified":"2012-08-20T14:52:28","modified_gmt":"2012-08-20T21:52:28","slug":"abstract-non-potable-reservoirs-nr-10-3-1","status":"publish","type":"page","link":"https:\/\/kriegerandstewart.com\/?page_id=857","title":{"rendered":"Abstract &#8211; Non-potable Reservoirs NR-10.3.1"},"content":{"rendered":"<h2>Non-Potable Reservoirs NR-10.3.1 and NR-10.3.2 and Non-Potable Booster Pumping Station NB-10.3<\/h2>\n<p><strong>Client:<\/strong>\u00a0 Yucaipa Valley Water District<br \/>\n<strong>Location:<\/strong> Yucaipa, California<br \/>\n<strong>Construction Cost:<\/strong>\u00a0 $5M<\/p>\n<div class=\"column grid_4\"><\/p>\n<h3><span style=\"color: #0033cc;\">Project Features:<strong><br \/>\n<\/strong><\/span><\/h3>\n<ul>\n<li><span style=\"color: #0033cc;\">Two 400 hp Vertical Turbine Pumping Units<\/span><\/li>\n<li><span style=\"color: #0033cc;\">Dual Pressure Zone Design<strong><\/strong><\/span><\/li>\n<li><span style=\"color: #0033cc;\">Surge Arrestor<strong><\/strong><\/span><\/li>\n<li><span style=\"color: #0033cc;\">Surge Analysis Subconsultant<strong><\/strong><\/span><\/li>\n<li><span style=\"color: #0033cc;\">Complex Control Strategy<strong><\/strong><\/span><\/li>\n<li><span style=\"color: #0033cc;\">SCE Utility Coordination Required <strong><\/strong><\/span><\/li>\n<li><span style=\"color: #0033cc;\">SCADA System<\/span><\/li>\n<\/ul>\n<p><\/div><!-- .column (end) -->\n<p style=\"text-align: center;\"><div class=\"column grid_8 last\"><\/p>\n<p style=\"text-align: center;\"><img loading=\"lazy\" decoding=\"async\" class=\"aligncenter size-full wp-image-1686\" title=\"Non-Potable Reservoirs NR-10.3.1 and NR-10.3.2 and Non-Potable Booster Pumping Station NB-10.3\" src=\"https:\/\/kriegerandstewart.com\/wp-content\/uploads\/2012\/08\/Non-Potable_Res_NR-10_3_1.jpg\" alt=\"Non-Potable Reservoirs NR-10.3.1 and NR-10.3.2 and Non-Potable Booster Pumping Station NB-10.3\" width=\"503\" height=\"345\" srcset=\"https:\/\/kriegerandstewart.com\/wp-content\/uploads\/2012\/08\/Non-Potable_Res_NR-10_3_1.jpg 503w, https:\/\/kriegerandstewart.com\/wp-content\/uploads\/2012\/08\/Non-Potable_Res_NR-10_3_1-300x205.jpg 300w, https:\/\/kriegerandstewart.com\/wp-content\/uploads\/2012\/08\/Non-Potable_Res_NR-10_3_1-195x133.jpg 195w\" sizes=\"auto, (max-width: 503px) 100vw, 503px\" \/><\/p>\n<p style=\"text-align: center;\"><\/div><!-- .column (end) --><br \/>\n<div class=\"clear\"><\/div><\/p>\n<h3>Description:<\/h3>\n<p>The Non-Potable Booster Pumping Station NB-10.3 (NB-10.3) includes a dual zone booster station.\u00a0 NB\u201110.3 includes two separate pump stations which pump out of the Non-Potable Reservoirs NR-10.3.1 and NR-10.3.2.\u00a0 One pump station (12 Zone Pump Station) will pump to the 12 Zone and the other pump station (11 Zone Pump Station) will pump to the 11 Zone.\u00a0 The 12 Zone Pump Station will initially be equipped with two 400 hp pumps (one duty, one standby) with a capacity of 3,100 gpm and pump can for future 400 hp pump.\u00a0 Ultimately, the pump station will be equipped with three 400 hp pumps (two duty and one standby) with a capacity of 6,200 gpm.<\/p>\n<p>The 11 Zone Pump Station will not initially be equipped with pumps.\u00a0 Suction piping and three pump cans sized for 1,600 gpm pumps will be installed as part of the project.\u00a0 The project includes a 6,800 gallon surge tank, a manual transfer switch, and a generator termination box for connection to the District&#8217;s portable generator.\u00a0 <strong>The project involved working closely with and as an extension to District staff.<\/strong><\/p>\n<h3>Services Provided:<\/h3>\n<p>Krieger &amp; Stewart recently completed design engineering services (including hydraulic analyses; pumping unit selection; and civil, structural, mechanical, and electrical design) and is currently providing bidding support services.\u00a0 Krieger &amp; Stewart will provide construction engineering, construction management, construction inspection, construction staking, and startup services.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Non-Potable Reservoirs NR-10.3.1 and NR-10.3.2 and Non-Potable Booster Pumping Station NB-10.3 Client:\u00a0 Yucaipa Valley Water District Location: Yucaipa, California Construction Cost:\u00a0 $5M Description: The Non-Potable Booster Pumping Station NB-10.3 (NB-10.3) includes a dual zone booster station.\u00a0 NB\u201110.3 includes two separate pump stations which pump out of the Non-Potable Reservoirs NR-10.3.1 and NR-10.3.2.\u00a0 One pump station [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"parent":0,"menu_order":0,"comment_status":"open","ping_status":"open","template":"","meta":{"footnotes":""},"class_list":["post-857","page","type-page","status-publish","hentry"],"_links":{"self":[{"href":"https:\/\/kriegerandstewart.com\/index.php?rest_route=\/wp\/v2\/pages\/857","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/kriegerandstewart.com\/index.php?rest_route=\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/kriegerandstewart.com\/index.php?rest_route=\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/kriegerandstewart.com\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/kriegerandstewart.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=857"}],"version-history":[{"count":1,"href":"https:\/\/kriegerandstewart.com\/index.php?rest_route=\/wp\/v2\/pages\/857\/revisions"}],"predecessor-version":[{"id":1896,"href":"https:\/\/kriegerandstewart.com\/index.php?rest_route=\/wp\/v2\/pages\/857\/revisions\/1896"}],"wp:attachment":[{"href":"https:\/\/kriegerandstewart.com\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=857"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}