{"id":861,"date":"2012-05-16T11:54:51","date_gmt":"2012-05-16T18:54:51","guid":{"rendered":"http:\/\/beltegrity.com\/?page_id=861"},"modified":"2012-08-20T14:54:52","modified_gmt":"2012-08-20T21:54:52","slug":"abstract-leon-road-recycled-water-booster-station","status":"publish","type":"page","link":"https:\/\/kriegerandstewart.com\/?page_id=861","title":{"rendered":"Abstract &#8211; Leon Road Recycled Water Booster Station"},"content":{"rendered":"<h2>Leon Road Recycled Water Booster Station<\/h2>\n<p><strong>Client<\/strong>:\u00a0 Eastern Municipal Water District<br \/>\n<strong>Location:<\/strong> \u00a0Murrieta, California<br \/>\n<strong>Construction Cost:<\/strong>\u00a0 $2.5M<\/p>\n<div class=\"column grid_4\"><\/p>\n<h3><span style=\"color: #0033cc;\">Project Features:<strong><br \/>\n<\/strong><\/span><\/h3>\n<ul>\n<li><span style=\"color: #0033cc;\">7,500 gpm Booster Station<\/span><\/li>\n<li><span style=\"color: #0033cc;\">Three 350 hp Vertical Turbine Pumping Units with VFDs <strong><\/strong><\/span><\/li>\n<li><span style=\"color: #0033cc;\">Suction and Discharge Surge Arrestors<strong><\/strong><\/span><\/li>\n<li><span style=\"color: #0033cc;\">Masonry Block Building with Sound Attenuation Features to Address Surrounding Residential Concerns<strong><\/strong><\/span><\/li>\n<li><span style=\"color: #0033cc;\">Separate Air Conditioned Electrical Room<strong><\/strong><\/span><\/li>\n<li><span style=\"color: #0033cc;\">SCE Utility Service Coordination Required<strong><\/strong><\/span><\/li>\n<li><span style=\"color: #0033cc;\">SCADA System<\/span><\/li>\n<\/ul>\n<p><\/div><!-- .column (end) -->\n<p style=\"text-align: center;\"><div class=\"column grid_8 last\"><\/p>\n<p style=\"text-align: center;\"><img loading=\"lazy\" decoding=\"async\" class=\"aligncenter size-full wp-image-1680\" title=\"Leon Road Recycled Water Booster Station\" src=\"https:\/\/kriegerandstewart.com\/wp-content\/uploads\/2012\/08\/Leon_Rd_Recycled_Water.jpg\" alt=\"Leon Road Recycled Water Booster Station\" width=\"448\" height=\"344\" srcset=\"https:\/\/kriegerandstewart.com\/wp-content\/uploads\/2012\/08\/Leon_Rd_Recycled_Water.jpg 448w, https:\/\/kriegerandstewart.com\/wp-content\/uploads\/2012\/08\/Leon_Rd_Recycled_Water-300x230.jpg 300w, https:\/\/kriegerandstewart.com\/wp-content\/uploads\/2012\/08\/Leon_Rd_Recycled_Water-195x149.jpg 195w\" sizes=\"auto, (max-width: 448px) 100vw, 448px\" \/><\/p>\n<p style=\"text-align: center;\"><\/div><!-- .column (end) --><br \/>\n<div class=\"clear\"><\/div><\/p>\n<h3>Description:<\/h3>\n<p>The Leon Road Recycled Water Booster Station was designed to pump 7,500 gpm of recycled water from the Temecula Valley Regional Water Reclamation Facility to the District&#8217;s 1627 Pressure Zone using three VFD controlled vertical turbine pumping units (two duty, one standby) with 350 hp motors.\u00a0 Project facilities included: \u00a0VFD controlled vertical turbine booster pump station; two room masonry block building to house the electrical and pump equipment with separate air conditioned electrical room; suction and discharge surge tanks, compressor, and appurtenances; electrical service; SCADA (remote telemetry unit); electrical switchgear; site grading; site piping; and masonry block wall.\u00a0 <strong>The project involved working closely with and as an extension to District staff.<\/strong><\/p>\n<h3>Services Provided:<\/h3>\n<p>Krieger &amp; Stewart provided design engineering services, including records search; surge analyses; preliminary design; hydraulic system analysis; design survey; geotechnical investigation; utility service application, design, and coordination; and contract document preparation.\u00a0 Krieger &amp; Stewart also provided bid phase services and construction engineering support services to Eastern Municipal Water District.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Leon Road Recycled Water Booster Station Client:\u00a0 Eastern Municipal Water District Location: \u00a0Murrieta, California Construction Cost:\u00a0 $2.5M Description: The Leon Road Recycled Water Booster Station was designed to pump 7,500 gpm of recycled water from the Temecula Valley Regional Water Reclamation Facility to the District&#8217;s 1627 Pressure Zone using three VFD controlled vertical turbine pumping [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"parent":0,"menu_order":0,"comment_status":"open","ping_status":"open","template":"","meta":{"footnotes":""},"class_list":["post-861","page","type-page","status-publish","hentry"],"_links":{"self":[{"href":"https:\/\/kriegerandstewart.com\/index.php?rest_route=\/wp\/v2\/pages\/861","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/kriegerandstewart.com\/index.php?rest_route=\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/kriegerandstewart.com\/index.php?rest_route=\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/kriegerandstewart.com\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/kriegerandstewart.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=861"}],"version-history":[{"count":1,"href":"https:\/\/kriegerandstewart.com\/index.php?rest_route=\/wp\/v2\/pages\/861\/revisions"}],"predecessor-version":[{"id":1898,"href":"https:\/\/kriegerandstewart.com\/index.php?rest_route=\/wp\/v2\/pages\/861\/revisions\/1898"}],"wp:attachment":[{"href":"https:\/\/kriegerandstewart.com\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=861"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}