Krieger & Stewart, Incorporated
  • Home
  • The Solutions
    • Infrastructure Projects
    • Environmental Plans, Reports, Studies, and Permitting
    • Right of Way and Property Issues
    • Engineering and Natural Resource Challenges
    • Planning and Project Financing
  • The Advantage
    • Why Clients Partner with Us
    • We’ll Free Up Your Staff
    • We’ll Manage the Details
    • We’ll Protect Your Interests
    • Hiring the Right Engineering Firm
  • The Firm
    • Our Approach to Services
    • Quality of Services
  • Project Profiles
    • Water/Wastewater Treatment
    • Groundwater Source Development
    • Water Distribution Systems
    • Wastewater Collection Systems
    • Recycled Water Distribution Systems
  • Careers
    • Associate Civil Engineer
    • Construction Engineer
    • Electrical Inspector/Field Commissioning Specialist
    • Senior Civil Engineer
  • Contact Us
Search the site...

Snow Creek Diversion, Headworks, and Power Generation Project

Client:  Desert Water Agency
Location:  Palm Springs, California
Construction Cost:  $6.1M

Project Features:

  • Concrete Surface Water Diversion Facilities
  • Moving Intake Screen
  • Water Treatment and Disinfection Facilities
  • 1.0 MG Water Storage Retention
  • 11,000 L.F. of 20″ Penstock
  • 350 kW Hydroelectric Generating Station
  • 38,600 L.F. of 24″ Water Transmission Pipeline

Snow Creek Diversion, Headworks, and Power Generation Project


Description:

The project consisted of the construction or reconstruction of numerous facilities related to the diversion of water from the Agency’s Snow Creek surface water source.  Facilities constructed included a replacement reinforced concrete surface water diversion, new headworks (including intake screen, water treatment, and disinfection facilities), a 1.0 MG welded steel water storage reservoir, 11,000± L.F. of 20″ diameter aboveground and belowground penstock running from the storage reservoir to a 350 kW hydroelectric generating station, the hydroelectric generating station, and 38,600± L.F. of 24″ transmission pipeline running from the generating station to the Agency’s service area in the City of Palm Springs.

Services Provided:

Services provided by Krieger & Stewart included preparation of numerous environmental documents, Caltrans longitudinal encroachment permit acquisition, surveying, site and alignment selection, utility excavation and verification, preliminary design, design engineering (including structural, electrical, and mechanical engineering), equipment selection, contract document preparation, assistance with the bidding and award process for each phase/component of the project, and construction engineering (contract administration, submittals review, and construction observation, and field testing of all project facilities).