Krieger & Stewart, Incorporated
  • Home
  • The Solutions
    • Infrastructure Projects
    • Environmental Plans, Reports, Studies, and Permitting
    • Right of Way and Property Issues
    • Engineering and Natural Resource Challenges
    • Planning and Project Financing
  • The Advantage
    • Why Clients Partner with Us
    • We’ll Free Up Your Staff
    • We’ll Manage the Details
    • We’ll Protect Your Interests
    • Hiring the Right Engineering Firm
  • The Firm
    • Our Approach to Services
    • Quality of Services
  • Project Profiles
    • Water/Wastewater Treatment
    • Groundwater Source Development
    • Water Distribution Systems
    • Wastewater Collection Systems
    • Recycled Water Distribution Systems
  • Careers
    • Associate Civil Engineer
    • Construction Engineer
    • Electrical Inspector/Field Commissioning Specialist
    • Senior Civil Engineer
  • Contact Us
Search the site...

Menifee/Perris I Iron and Manganese Removal Treatment Facilities

Client: Eastern Municipal Water District
Location: Perris, California
Construction Cost: $15M

Project Features:

  • Backwash and Recycled Water Booster Stations
  • Sodium Hypochlorite and Sodium Bisulfite Feed Systems
  • Onsite Generation of Sodium Hypochlorite at Plant and Ten Well Sites
  • ASME Vessels with Features Common to Surge Tanks
  • Complex Control Strategy Involving Differing Chemistry of Ten Wells
  • SCE Utility Service Coordination Required
  • SCADA System

 Menifee/Perris I Iron and Manganese Removal Treatment Facilities


Description:

Menifee/Perris I Iron and Manganese Removal Treatment Facilities project consists of an 8,200 gpm pretreatment facility for an existing reverse osmosis water treatment plant. Treatment facilities include: catalytic oxidation and filtration provided by five filter pressure vessel; sodium hypochlorite and sodium bisulfite chemical feed systems; onsite sodium hypochlorite generation with facilities ranging from 75 pounds of chlorine per day to 600 pounds of chlorine per day at 10 well sites and main plant; 3,000 gpm backwash booster station; 800 gpm recycle water booster station; two 160,000 gallon glass lined bolted steel storage tanks for backwash and recycled water storage; and automated control valve systems for maintaining constant feed pressure to the existing reverse osmosis plant. The project involved working closely with and as an extension to District staff. Constructability and sequencing considerations were an integral portion of both the design and construction engineering services.

Services Provided:

Krieger & Stewart recently completed design engineering services (including planning; civil, structural, mechanical, electrical, and instrumentation design; and bidding support services) and is currently providing construction management support services to Eastern Municipal Water District. Krieger & Stewart will also provide startup services prior to project completion.